編號 : 2021151
項目名 : Site Visit to Tseung Kwan O Lam Tin Tunnel (CEDD Project Contract No:.NE/2015/01)
學會持續專業發展編號 : Formal Events
講師 : Mr. Russell Lang

Mr. Lang is the Project Director of Contract NE/2015/01. He has nearly 40 years of civil engineering projects experience, and has been the in charge of mega size infrastructure projects in Hong Kong and other countries around the world.

Sr David Tam
BSc (QS), PGC (HKL), MA (Arb&DR), MRICS, MHKIS

Sr David Tam is the Head of Commercial in Leighton Contractors (Asia) Ltd. He is an accomplished leader who has extensive and diverse construction industry experience in major developments and large civil Infrastructure projects. Mr. Tam also holds the position of Commercial Manager of Contract NE/2015/01.

Sr Law Sing Long, Joseph
BSc(Hons), FHKIS, RPS(QS), PgDip (Arb)

Sr Joseph Law is a Commercial Manager in China State Construction Engineering Ltd. He has over 20 years of construction industry experience in a wide range of private development and large civil Infrastructure projects across Asia and Hong Kong. Mr. Law also holds the position of Deputy Commercial Manager of Contract NE/2015/01.
日期 : 2021-12-18
時間 : 10:00 am – 12:00 noon
註冊截止日期 : 2021-12-13
有關組別之資格預審前研習小時 : 2
Divisional PQSL Hour(s) : 2
地點 : Lam Tin Tseung Kwan O Tunnel Project
部門 : QSD
主辦者 : Quantity Surveying Division
費用 : HK$200 for members
名額 : QSD members; first-come-first-served
語言 : Cantonese supplemented by English
詳情 :

The project is for the construction of a dual two-lane highway approximately 3.8 km long connecting Tseung Kwan O (TKO) at Po Shun Road in the east with proposed Trunk Road T2 in Kai Tak Development in the west. About 2.2 km of the highway is in the form of tunnel. The contract sum of the project is HK$8.7 Billion.

This project, together with the Trunk Road T2 and Central Kowloon Route (in progress), will form the Route 6 which will provide an east-west express link between West Kowloon and TKO areas. The TKO-LTT project is being developed to alleviate traffic congestion during peak hours at the existing Tseung Kwan O Tunnel and to meet the traffic demand from the anticipated population increase in the Tseung Kwan O district.

The commercial and claims management in post contract stages are the key factors for successful delivery of this project. The site professional quantity surveying team will share some insights and experience gained on this project to roundoff the event.

備註 :

FULL (NO WALK IN AVAILABLE)

Rescheduled from 16 October 2021

Same as the visit held on 11 December 2021

  1. Online registration is NOT accepted for this CPD event. First-come-first-served with duly completed Declaration Form, Standard Reservation Form and payment.
  2. Successful registrants will receive an email confirmation.
  3. Admitted participants are required either (a) to receive two doses of Covid 19 vaccination; or (b) to possess a negative test result certificate for Covid 19 within 14 days prior to the date for site visit. Before entering the site, an electronic health declaration form shall be completed.
  4. All participants will be asked to wear masks during the visit, maintain social distance and comply with the latest regulations regarding prohibition on group gathering.
  5. All participating members shall arrange their own transport to the venue.
  6. While HKIS will arrange for insurance policy (COVID-19 and/or pandemics are excluded) for the participants, members may consider taking out their own insurance policy to cover their own risks
  7. Latecomers will NOT be picked up and will NOT be allowed to join the visit.
付款 : HKD 200
Face-to-Face/Zoom : Please refer to the remarks