編號 : 2019045
項目名 : Cost Control for Maintenance and Repair Works in Aging Buildings
學會持續專業發展編號 : Formal Events
講師 : Sr Thomas Ho

Thomas is the Past President (2016-2017) of the Hong Kong Institute of Surveyors. He was also the Chairman (2011-2012) of the Quantity Surveying Division of The Hong Kong Institute of Surveyors and the Chairman (2015-2016) of Surveyors Registration Board. He is the Managing Director of TLS & Associates Ltd., a Quantity Surveying Consulting firm on Hong Kong Government list and has worked as a quantity surveyor for over 30 years both in building and infrastructure works. Thomas is a Fellow of the HKIS, Fellow of CECA, accredited mediator of HKMAAL, HKIAC and HKIS/HKIA and was the mediators in several mediation cases in construction and financial disputes.
日期 : 2019-04-23
時間 : 7:00 pm - 8:30 pm
註冊截止日期 : 2019-04-09
有關組別之資格預審前研習小時 : 1.5
Divisional PQSL Hour(s) : 1.5
地點 : 香港上環干諾道中111號永安中心12樓 1207室測量師研習中心
部門 : QSD
主辦者 : Quantity Surveying Division
費用 : HK$150 for members; HK$210 for non-members (HK$30 walk-in surcharge on all prices listed)
名額 : QSD Members; First-come-first-served
語言 : Cantonese supplemented by English
詳情 :

With the increasing number of aged buildings in Hong Kong, building maintenance and repair are essential to ensure safety of such buildings. However, owners of such buildings may not have professional knowledge on the maintenance and repair works and hence may find it difficult to assess whether the tenders for repairing works of their buildings are reasonable or not.

Due to the difference in nature between new works and maintenance and repairs works, the tendering and cost control system used in new works and maintenance and repair works may be different. There are criticisms on the tendering and cost control system used in maintenance and repair works and whether the tendered prices of such works are reasonable or not.  In this presentation, Sr Ho will briefly explain the tendering and cost control system commonly adopted in new works and maintenance and repair works, based on his experience in both new works and maintenance and repair works, and suggest ways to improve the tendering and cost control system in maintenance and repair works.

備註 :

(Registration and networking time: from 6:30 pm)

FULL (NO WALK IN AVAILABLE)

付款 : HKD 150
Face-to-Face/Zoom : Please refer to the remarks