編號 : 2019048
項目名 : Experience sharing in representing a plumbing subcontractor in excess lead in drinking water case and subsequent dispute resolution with the main contractor
學會持續專業發展編號 : Formal Events
講師 : Dr. LEE Kin-wang

Dr. LEE Kin-wang has over forty years’ experience in construction projects and was the Head of the Estates Division of a Subvented Educational Institution until October 2014, overseeing construction of new campuses and repairs / maintenance / AA works of existing premises.

Dr. LEE is currently a practising barrister with main practicing areas in personal injuries, industrial summons and construction related claims / adjudication / mediation.

Dr. LEE is also a Dispute Resolution Advisor of the Architectural Services Department.
日期 : 2019-05-07
時間 : 7:00 pm - 8:30 pm
註冊截止日期 : 2019-04-23
有關組別之資格預審前研習小時 : 1.5
Divisional PQSL Hour(s) : 1.5
地點 : 香港上環干諾道中111號永安中心12樓 1207室測量師研習中心
部門 : QSD
主辦者 : Quantity Surveying Division
費用 : HK$150 for members; HK$210 for non-members (HK$30 walk-in surcharge on all prices listed)
名額 : QSD Members; First-come-first-served
語言 : Cantonese supplemented by English
詳情 :

1.    Excess lead in drinking water; what is that? Leaded solder Vs unleaded solder;

2.    Commission of Inquiry - legislation relating to a commission of inquiry;

3.    Gist of the findings of the Commission;

4.    Problems with the plumbing industry, the main contractor, the plumbing subcontractor and the statutory bodies in the incident;

5.    Claims lodged by the main contractor on its domestic plumbing subcontractor:

      (a)    Temporary water supply pipes;
      (b)    Cost of replacement of all copper water pipes;
      (c)    Cost of provision of water filter;
      (d)    Cost of water charges reimbursed by main contractor to tenants.

6.   Plumbing subcontractor refuted claim by asserting:

      (a)    Remoteness of main contractor’s claim;
      (b)    Plaintiff to mitigate loss;
      (c)    Political decision and not based on terms of domestic subcontract; and
      (d)    Source of lead in drinking water not related solely to leaded-solder.

備註 :

 (Registration and networking time: from 6:30 pm)

FULL (NO WALK IN AVAILABLE)

付款 : HKD 150
Face-to-Face/Zoom : Please refer to the remarks