編號 : 2021049
項目名 : Experience sharing on constructing Quarantine Camps and Temporary Hospital using Modular Integrated Construction (MiC) technology
學會持續專業發展編號 : Formal Events
講師 : Mr. Matthew Sze
Mr. Sze is the Director & Deputy General Manager of China State Hailong Construction Technology Company Limited, chartered Civil Engineer MICE and MHKIE. He has over 27 years of experience in the construction industry including 21 years of working experience in overall project planning, technical issue, quality control and co-ordination in the production of precast concrete components to various building and civil projects at off-site precast factory.

Mr. Ben Poon
Mr. Poon is the Assistant Project Director of MiC manufacturer China State Hailong Construction Technology Company Limited, whose mandate is to oversee the MiC projects in Hong Kong including research & development, tendering, design and construction etc. He has over 26 years of experience in the construction industry; in particular, working experience in public and subsidised sale flats projects development. He was also the Project Manager in the first project to apply the volumetric precast concrete components in Hong Kong.
日期 : 2021-05-10
時間 : 7:00 pm - 8:30 pm
註冊截止日期 : 2021-05-07
有關組別之資格預審前研習小時 : 1.5
Divisional PQSL Hour(s) : 1.5
地點 : By online media – ZOOM
部門 : QSD
主辦者 : The Hong Kong Institute of Surveyors (Quantity Surveying Division) and Hong Kong Institute of Construction Managers
費用 : HK$150 for HKIS and HKICM members; HK$210 for non-members
名額 : HKIS and HKICM members; first-come-first-served
語言 : Cantonese supplemented by English
詳情 :

In response to the rapid development of the outbreak of Covid-19 since early 2020, the Architectural Services Department (ArchSD) orchestrated the construction of quarantine camps and temporary hospital started in early February with the application of Modular Integrated Construction (MiC) technology. The concept of MiC method “factory assembly with interior decoration followed by on-site installation” can greatly shorten site construction time and meet the demands arising from the epidemic. It can also enhance productivity, quality control and site safety.

Our speakers, Mr. Sze and Mr. Poon will share their practical experience in the design, construction and transportation aspects including the problem encountered on Quarantine Camps and Temporary Hospital Project.

備註 :

The event will be conducted online via ZOOM. Successful registrants will be notified separately via email with the web link in due course to the online event.

Please install the Zoom Application in advance at https://www.zoom.us/download.

  • For Mobile phones, iPads & Android, install the ZOOM Cloud Meetings app from App Store or Play Store.
  • For PC and Mac, download and install the Zoom Client for Meetings.
付款 : HKD 150
Face-to-Face/Zoom : Please refer to the remarks